微信营销
欢迎关注浦光仪表微信公共帐号
1扫描以上二维码2加微信号:

Mail| Chinese| English|Map|Disclaimer

China's first electric power measurement acquisition terminal of intelligent system in Qinghai put into operation

author:shpg   add time:2016-10-19 10:54:10   browse:

The day before, the first domestic electric power measurement acquisition terminal intelligent warehouse system is put into operation in Qinghai Electric Power Research Institute of Metrology Center system, reducing the labor intensity of operators in the actual application, to abandon the traditional manual handling mode, achieve the overall goal of intelligent warehousing, logistics and distribution ", truly measurement service process automation, information query, rapid asset quality management control, decision support perspective, a strong impetus to the electric power metering business in China to modernization and informationization.

The system was first introduced the concept of intelligent acquisition terminal, started construction in late June this year, in late September to complete the main business flow data test run. The project mainly includes the basic environment renovation, equipment delivery, installation, electrical hardware debugging and software debugging, realize the measurement of several important aspects, business process management and monitoring by using visualization technology, promote the optimization and perfection of measurement business marketing business application system, "four line base interface debugging, software version, curing the function of deepening perfect, field verification testing and other key technical breakthrough and make a positive contribution.

It is understood that the system adopts the design of new storage shelves of single row deep double space design pattern, which can utilize existing space, but also to meet the needs of mass inventory. Among them, the main business transfer using mature shuttle bus material transport mode, on the one hand, to avoid the shortcomings of the original automatic guided vehicles; on the other hand, the greater the stability of the equipment to improve the operation.

After nearly half a month of practical test operation, the function of the system is running normally, and the engineering design requirements are achieved, and the practical application is realized. The construction and application of the system, to accelerate the integration of power metering control, change the traditional management mode of measurement, measurement to enhance the power of modernized management and service level, to ensure the consistency and integrity of data measurement of electric power marketing business, based on the life cycle management of electric power metering to improve lean management level, measurement of assets has laid a solid foundation.


on ano
nextSIEMENS will provide installation and maintenance services for the most strong wind farm in Thailand
bottom.jpg
  • fax:021-51685578
  • mail:info@puguang.com
  • address:Zhabei District, Haining, Shanghai Road, No. 899, Changtai enterprise World Plaza, A building, 22 floors
link:BaiduSougou